The second batch of solid control system supporting equipment of CCK project has been successfully delivered

Recently, the second batch of low-temperature mud solid control system supporting equipment of the Russian CCK project was successfully delivered.This batch of equipment is mainly the mud tank and sand pump supporting the low-temperature mud solid control system. There are a total of seven tanks, in

The second batch of solid control system supporting equipment of CCK project has been successfully delivered Read More »